Certification-first engineering
UN38.3 (including the new 3-metre stacking test), MSDS and air/sea transport reports issued per model. CE, FCC and UL2056 files ready before you ask.
OEM / ODM POWER BANK MANUFACTURER
12 years in lithium battery assembly. 500,000 units a month from Vietnam and India. UN38.3, CE, FCC and UL-ready designs for brands in 38 countries.
UN38.3 (including the new 3-metre stacking test), MSDS and air/sea transport reports issued per model. CE, FCC and UL2056 files ready before you ask.
Tool-free replaceable cell on our main lines — ahead of Regulation (EU) 2023/1542, which makes user-replaceable portable batteries mandatory from 18 February 2027.
Class 9 sea freight and PI967 air with documented SoC ≤ 30%. We book the DG slot, declare it properly, and give you the paperwork before the container moves.
Product range
15W MagSafe-compatible, snap-on charging
View line → 026–10mm ultra slim, pocket friendly
View line → 03PD 3.0 / PPS, charges laptops at full speed
View line → 0420000–30000mAh for outdoor & travel
View line → 05No cable to lose, 3-in-1 output
View line → 06Logo printing, custom mould, gift box
View line →Selected models
10000mAh · 15W magnetic wireless + 20W PD · aluminium frame
5000mAh · 6.8mm · 108g · built for pocket and pouch
20000mAh · 65W PD 3.0 · charges a 13" laptop 1.6 times
5000mAh · full-colour print · gift box · 10-day turnaround
OEM / ODM
Most custom programmes fail at step two, when the sample does not match the drawing. We shorten that by putting an engineer on the first call instead of a salesperson.
See the processCapacity, output protocol, target market, certification scope and target landed cost. 30 minutes, engineer present.
BOM-based quote with tiered pricing, plus a design-for-manufacture note flagging anything that will cost you money later.
5–7 days for existing tooling, 15–20 days for a new mould. Sample fee refunded against the first mass order.
UN38.3, MSDS, CE and FCC run in parallel with tooling. Reports issued in your company name where the scheme allows.
20–25 days, with AQL 2.5 pre-shipment inspection, DG declaration and a loading video before the container leaves.
Factory
Eight SMT lines, four assembly lines, an in-house reliability lab and a separate DG packing area. Photos below are from the Bac Ninh plant, taken in 2026.
Compliance
Lithium battery transport test summary, including the 3-metre stacking test required from 2026.
Material safety data sheet in the format required by air and sea carriers.
EN 55032 / EN 55035, EN 62368-1 and EN IEC 63000. Note: power banks fall outside LVD (below 75V DC).
Conformity assessment under (EU) 2023/1542, with EU authorised representative on the label.
Buyer questions
Short answers. Longer ones on the FAQ page, and we will go through the rest on a call.
500 pcs for logo printing on existing tooling, 1,000 pcs for custom colour, and 3,000 pcs for a new mould. Sample orders below MOQ are possible at a unit surcharge.
5–7 days for existing models, 15–20 days for a new mould. Courier transit is 3–5 days with a dangerous goods account.
Yes, for units at or below 100Wh with a valid UN38.3 report and state of charge ≤ 30%, under PI967. Above 100Wh we quote sea freight by default because Section I approval adds cost and time.
Yes. Under GPSR and the Battery Regulation an EU-based responsible person is mandatory. We work with a partner in Germany and can print their address on your label.
Request a quote
Tell us the capacity, the market and the volume. You get a BOM-based price, a certification scope note and a realistic lead time — not a brochure.